Join us as we celebrate the completion of the $2 million extension project, located at the southern end of The Greenline.
The extension is approximately 1,200-feet long, connecting to existing walking trails along the San Antonio River at Mission Reach stretching from the historic missions through downtown, The Pearl, and up to Brackenridge Park. It will feature a 10-foot wide mixed-use pathway, a 43-foot long tunnel underneath the Union Pacific Railroad line, landscaping, drainage structures, and shaded congregation areas.
Speakers:
• Bexar County Judge Nelson W. Wolff
• City of San Antonio Mayor Ron Nirenberg
• Jim Campbell, Brooks Board Chair
• Derek Boese, San Antonio River Authority General Manager